Menu
Language
All categories
      Product ID: 66680225

      Photovoltaic Hydraulic Crawler Post Pile Driver

      Contact Now

      Description

      产品描述

      The piling speed of the photovoltaic post pile driver is fast, and the average piling can be 6 meters deep in 3 minutes, that is, one hole can be made in 3 minutes. Solar pile driver is about half of the oil used in ordinary pile drivers. You can leave a pile driver for you in one year. The crawler  solar post pile driver track after special processing, it is suitable for various geological environments, and has strong walking, walking and climbing ability. The frame can be moved back and forth, the drill bit can be adjusted left and right, and the pile positioning is accurate.

      Technology Parameters 

       

      HWZGX-390L 系列

      锤子模型

      390

      行程 M

      5 分钟

      双齿轮泵压力mpa)

      20

      杆径 /mm

      0-400

      双齿轮泵排量 ml/r)

      40

      液压系统压力mpa)

      20

      整机重量 /T

      6.3

      旋转角度 /°

      360

      Diesel engine (kw)

      80

      尺寸(长宽x高)/mm

      5150*2150*2700

      履带板 (mm)

      350

      行走电机总排放量 (ml/n)

      1575

      行走电机转速 (r/min)

      50


      crawel pile driver

       

      solar pile driver

      Please Send Message

      ${currentPro.title}

      - Send